September 10, 2026
On a Saturday morning at Newtown Park, the farmers market is past its peach-and-pepper peak, the stretch regulars know best from late July into August, and the vendor lineup will start thinning as October gets closer. A dog trots past on a leash headed for the fenced turf at Newtown Dream Dog Park. Somewhere behind City Hall, a sound crew is testing microphones for that evening's free concert. None of this required Medley to open. All of it has been happening for months, and this fall it connects into something new: a continuous walk from the dog park and market at Newtown Park, across a pond-side amphitheater trail, and under Medlock Bridge Road into the corridor where Johns Creek's long-awaited town center is still under construction.
The tunnel that makes that walk possible opened quietly in August, weeks before anyone expected the city's bigger headline. Every local story this year has counted down to October 29, the date Medley's first phase opens its doors. But the piece of infrastructure that ties the neighborhood together arrived first, without a ribbon-cutting anyone outside city government seemed to notice, and it already links to a park that has been drawing crowds since May. The walkable era in Johns Creek didn't start with a grand opening. It started with a hole under a state route.
Johns Creek has tried this before. In April 2018, the city opened a pedestrian tunnel under State Route 141 near McGinnis Ferry Road, decorated with a 130-foot mural by international artist Hanif Kureshi. It solved a narrower problem for a narrower stretch of road.
The new $7 million tunnel, cut beneath Medlock Bridge Road, does more work. It links The Boardwalk at Town Center on the east side of SR 141 directly to the block where Medley's shops and restaurants are finishing construction on the west side, closing the seven-lane gap that used to make crossing on foot pointless. The floor is turfed, built with pop-up markets in mind rather than just foot traffic. City officials have not said whether more crossings like it are planned elsewhere along the corridor, but for now it stands as the connective piece between two of the city's largest recent public and private investments.
The tunnel broke ground in November 2024 and opened about twenty-one months later, arriving well ahead of Medley's own opening date. That sequencing matters for anyone who lives nearby: the walk existed before the retail did.
The Boardwalk at Town Center opened on May 8, 2026, with a free concert behind City Hall featuring Boy Band Review and Music Authority's Eclipse. The $39 million, 20-acre park includes a 15-foot-wide elevated trail circling a wetland and pond, terraced seating, pond overlooks, and a bandshell built for an amphitheater with a 4,000-person capacity. The full loop runs about a mile north from Johns Creek Parkway to McGinnis Ferry Road, with a half-mile loop around the north pond alone.
None of that was built to serve Medley. It was built to serve the neighborhood that already exists, and it spent an entire summer doing exactly that before the tunnel gave it a second front door.
The city's Summer Concert Series has run since May, alternating between Newtown Park and the Boardwalk. Two dates remain before the season closes:
There's also a free public event squeezed between those two, Arts on the Boardwalk on Saturday, September 26, running from 1 to 4 p.m. at the park behind City Hall.
Line those three dates up against October 29 and the shape of the season becomes obvious. The Symphony closer on October 3 is the last neighborhood event before Medley's grand opening reshapes what a Friday night here looks like. After that, the corridor gets a second gravitational pull, one built around national retail tenants and a hotel rather than a city parks calendar.
Any walk that starts at Newtown Park usually starts at the dog park, and Johns Creek's version has a track record worth knowing. Newtown Dream Dog Park, a one-acre fenced space with artificial turf, agility obstacles, a splash pad, and separate areas for large and small dogs, was ranked the third-best dog park in the country in USA Today's 2025 10Best Readers' Choice awards, one spot down from second place the year before. Two years running in the national top three is not a fluke, and it's the kind of amenity that anchors the whole loop just as much as the amphitheater does.
The dog park isn't part of the new tunnel route in any physical sense. It sits at the same anchor point, though, sharing a parking lot and a Saturday rhythm with the farmers market and the walk into the wetland trail. For a resident stringing together an errand and an outing, it's the same trip.
Medley's tenant announcements have generated most of the recent headlines: Trader Joe's, Shake Shack, a boutique hotel eventually flagged under a national lifestyle brand. But the corridor has already absorbed two changes that don't need a grand opening to matter day to day.
Dutch Bros opened a Johns Creek location on July 25, 2025, at 9630 Medlock Bridge Road, adding a drive-thru coffee stop to a stretch of road that residents drive constantly. Whataburger followed in February 2026 with a 24-hour location on State Bridge Road, complete with a double drive-thru and digital ordering kiosks. Neither is glamorous. Both are the kind of change that shows up in a daily commute long before a $560 million mixed-use project does.
There's also a quieter shift happening a half-mile from Medley. Boston Scientific's new life sciences research facility opened adjacent to the development in 2025, with plans to bring more than 300 employees to the area. Medley's own office component will add Boehringer Ingelheim's new U.S. headquarters, taking over 70,000 square feet once it opens. Between the two, the corridor is picking up daytime foot traffic that has nothing to do with Medley opening its doors and everything to do with what's already parked next to it.
For the next several weeks, the loop from Newtown Park's dog run and farmers market, across the Boardwalk's wetland trail, through the new tunnel, and into a still-quiet stretch of Medley's construction zone belongs mostly to the people who already live nearby. Once October 29 arrives and the first wave of shops, restaurants, and eventually 900 residential units fill in on the other side of that tunnel, the same walk will carry a different kind of crowd.
That's not a reason to rush the calendar. It's a reason to use it. The Symphony closer on October 3 marks the last weekend before the corridor's identity shifts from a city park system to a mixed-use district with national tenants and a much larger footprint. Between now and then, the walk under Medlock Bridge Road is still just a neighborhood shortcut, and it's worth taking while it still feels like one.
Whenever the next chapter of your own Johns Creek address comes into view, whether that's a move within the neighborhood or a decision about what a home near this corridor is actually worth as Medley opens, Tasha Kline brings the kind of local read that comes from watching these details unfold in real time. Reach out to request a personalized home valuation and talk through what the next few months of change might mean for your property.
Stay up to date on the latest real estate trends.
Discover the finest homes North Atlanta has to offer. Stay connected to exclusive listings, market insights, and opportunities curated by a luxury real estate advisor with expertise in North Atlanta’s market.